Search intensified at Upper Trishuli-3 B with arrival of heavy excavators
english.onlinekhabar.com · Tue Sep 08 07:34:36 GMT 2026

Kathmandu, September 8
Search efforts for people missing after the Bhotekoshi-Trishuli floods have intensified at the 37 MW Upper Trishuli-3 B Hydropower Project following the arrival of three large excavators and a backhoe loader.
Read full story at source (english.onlinekhabar.com)