Road Blockage Cleared on Nagdhunga-Mugling Section
english.ratopati.com · Wed Sep 09 06:58:17 GMT 2026

Kathmandu. The road blocked at Krishnabhir on the Nagdhunga-Mugling road section due to the Rasuwa flood is being worked on at a rapid pace to bring it into operation as soon as possible.
According to Dhiraj Dhakal, chief and engineer of the Nagdhunga Mugling Road Project (West Section) under the Road Division, slope adjustment of the wall, soil cutting, and opening of a new track are being carried out at a war footing to clear the blocked road.
Read full story at source (english.ratopati.com)