Upper Myagdi-1 Hydropower Project Tunnel Breakthrough Achieved
english.ratopati.com · Thu Sep 10 00:57:50 GMT 2026

Myagdi. The tunnel from the audit to the dam of the 53.5 MW Upper Myagdi-1 Hydropower Project has been 'broken through'.
The tunnel connecting the audit in Chhahari of Dhawalagiri Rural Municipality-4 to the powerhouse under construction in Bharbang of Malika Rural Municipality-7, promoted by Myagdi Hydropower Limited, was connected on Wednesday.
Read full story at source (english.ratopati.com)