BP Highway Section in Kabhrepalanchok-Sindhuli to Reopen Within Hours After Blockage
english.ratopati.com · Fri Jul 10 00:40:04 GMT 2026

Kabhrepalanchok. Preparations have been made to open the BP Highway section in Kabhrepalanchok-Sindhuli, which was damaged by repeated floods and landslides and has started reconstruction, within half an hour if it gets blocked again. The Division Road Office Bhaktapur has stated that vehicles will be operated from the reconstructed track within a few days along with the reconstruction.< p>
This short-distance highway, connecting the eastern and central hilly regions of Nepal with the federal capital Kathmandu, used to be blocked as soon as it rained. The office is now preparing to bring the highway back into operation within half an hour if it gets blocked, and to ensure it is not blocked during the monsoon as much as possible.< p>
Read full story at source (english.ratopati.com)