One-way traffic managed on alternative route to Dhadingbesi
english.ratopati.com · Sat Sep 12 01:50:48 GMT 2026

Dhading. A system of operating one-way traffic with fixed timings has been arranged from today on the Paretar-Mastarr road, which is being used as an alternative route to reach Dhadingbesi after the Bhote Koshi flood washed away the Furkhe Khola bridge.
As it is difficult to manage traffic flow when vehicles operate from both directions simultaneously due to the narrow road, the District Administration Office, Dhading has arranged for one-way operation of transport vehicles by setting specific times.
Read full story at source (english.ratopati.com)