NEA directs hydropower projects to cut output amid monsoon surplus and transmission constraints
kathmandupost.com · Wed Jul 01 15:12:10 GMT 2026

Rising river flows have pushed generation beyond domestic demand, forcing the power utility to curtail production as transmission bottlenecks and limited export capacity strain the grid.
As water levels in rivers and streams rise with the onset of monsoon, Nepal’s hydropower generation has once again exceeded domestic demand, and the Nepal Electricity Authority (NEA) has instructed developers to reduce output.
Read full story at source (kathmandupost.com)