

Kabhrepalanchok. Preparations have been made to open the BP Highway section in Kabhrepalanchok-Sindhuli, which was damaged by repeated floods and landslides and has started reconstruction, within h...

Vehicles are currently running through diversions, with authorities continuing slope protection and embankment on new track. The BP Highway, damaged by the September 2024 floods, has still not bee...

Kathmandu. Preparations are underway to open the Bhakundebesi-Nepalethok section of the BP Highway, damaged by devastating floods last October, for traffic from the roadside by Asar 15 (mid-July). ...
KATHMANDU, June 12: At least seven people were killed and 15 others injured after a passenger bus crashed in Buchchakot of Namobuddha Municipality-2 along the BP Highway in Kavre district on Friday...

Kathmandu, June 12 A vehicle accident has occurred at Buchakot in Kavre along the BP Highway. According to Kavre’s DSP Rabin Bishta, seven people died in the accident. He stated that 15 people i...
KAVREPALANCHOK, June 9: Vehicular movement along the BP Highway has been suspended from 12:30 PM, bearing in mind potential risks posed by rising water levels in the local Roshi Khola.