Baitrawati Bailey Bridge Installation to Begin Within 15 Days
english.ratopati.com · Fri Sep 11 11:01:50 GMT 2026

Kathmandu. Installation of a bailey bridge in Baitrawati, Nuwakot, which was damaged by floods, will begin within the next 15 days.
According to Dharmendra Jha, coordinator of the bridge/bailey bridge construction and restoration task force formed by the Ministry of Physical Infrastructure Development, the bridge will be connected as soon as the technical preparations and foundation construction are completed.
स्रोतमा पूरा पढ्नुहोस् (english.ratopati.com)