Graveling Begins on Krishna Bhir Track of Prithvi Highway
english.ratopati.com · Sun Sep 13 11:50:22 GMT 2026

Chitwan. Gravel has started to be laid on the track built at Krishna Bhir on the Prithvi Highway from today. Graveling has been started along with widening the road and leveling the surface.
On August 31, the road's base was eroded by the Trishuli river's flood, causing it to collapse, and a track was being constructed by opening the adjacent hill. Work is progressing rapidly from both sides. According to Engineer Dhiraj Dhakal of the Naubise-Muglin Road Project West Section, the work of laying gravel is underway.
स्रोतमा पूरा पढ्नुहोस् (english.ratopati.com)