Trial One-Way Traffic Resumes at Krishnabhir After 12 Days
english.ratopati.com · Sun Sep 13 12:42:19 GMT 2026

Kathmandu. Trial one-way traffic has been operated at Krishnabhir on the Prithvi Highway after 12 days. Gas bullets and heavy vehicles that were stopped have been passed through Krishnabhir on a trial basis after speeding up the road construction work and preparing it up to the subgrade level.
According to Sahadev Khadka, operator of Sagun Construction, which has taken the responsibility of construction, and vice-president of the Federation of Contractors' Associations of Nepal, it has been possible to operate traffic on a trial basis at Krishnabhir after continuous efforts of about 12 days. He informed that the first gas bullet has been sent from Kathmandu towards Mugling and then heavy equipment and other vehicles that were stopped have also been gradually passed.
स्रोतमा पूरा पढ्नुहोस् (english.ratopati.com)