Temporary footbridge, ‘tuin’ installed to restore access in Rasuwa
myrepublica.nagariknetwork.com · Mon Sep 14 06:41:31 GMT 2026

RASUWA, Sept 14: Temporary bridges have been installed over the Phalakhu and Bhotekoshi rivers along the Rasuwa-Nuwakot road section after floods destroyed the concrete bridges, disrupting road connectivity.
स्रोतमा पूरा पढ्नुहोस् (myrepublica.nagariknetwork.com)