Ravaging flood leaves trail of destruction
risingnepaldaily.com · Thu Aug 27 00:41:46 GMT 2026

Nuwakot (Dhunge Bazaar), Aug. 27: When 32-year-old Suraj Shrestha left the construction site of the Trishuli-3B hydropower project at around 9:00 am on Wednesday, he had received no warning that a devastating flood was about to strike.
स्रोतमा पूरा पढ्नुहोस् (risingnepaldaily.com)