Rasuwagadhi Hydropower Project Damaged by Flood, Most Employees Reported Missing
ictframe.com · Thu Aug 27 05:08:40 GMT 2026

27th August 2026, Kathmandu
The 111 MW Rasuwagadhi Hydropower Project in Rasuwa district has suffered severe physical destruction following a massive flash flood in the Bhotekoshi River.
स्रोतमा पूरा पढ्नुहोस् (ictframe.com)