BP Highway reconstruction continues as flood damage repairs drag on
kathmandupost.com · Sun Jul 05 04:22:48 GMT 2026

Vehicles are currently running through diversions, with authorities continuing slope protection and embankment on new track.
The BP Highway, damaged by the September 2024 floods, has still not been fully restored. Construction work is ongoing to raise the road up to eight metres above the riverbed level by building embankments to prevent further flood damage.
स्रोतमा पूरा पढ्नुहोस् (kathmandupost.com)